Only four more days before we’re back in the water. The snag list is getting shorter and slowly the stuff that was ordered is arriving. I may well be doing some of the final jobs on the water. Larger Jobs left to do are renew the toilet pump (arriving soon from U.S.) Sterilize the water systems. Refit new gas sensor, (again arriving from U.S.) Service Outboard. and of course – Polishing
The rest is putting away stores and generally tidying up.