
So there she was all ready to go. Up she went and they left me to antifoul my Centreboards. Then I found a split down the back edge of the port side blade. This was the one repaired by ridge a few years back but to be fair The split was in the front edge that time and it did drop down onto the concrete last year when in the slings which may have weakened it.
Anyway with all tools and materials cleared away at home there was nothing to do but drop her back down and postpone launch till after the weekend. Hopefully she will be in the slings again tomorrow afternoon so I can use the weekend to make repairs and do the antifouling.
I’d even blown up the dinghy in anticipation
